UK Landlord Certificate Checklist 2026 (England)
If you rent out a property in England, you have to keep several certificates and safety checks up to date. Some are needed every year, some every 5 or 10 years, and some before each new tenancy. It's easy to lose track, especially with 1–5 properties and no letting agent.
This guide lists every one in plain English, how often it's due, and what happens if you miss it.
Quick answer: most landlords in England need a Gas Safety Certificate (every year), an EICR (every 5 years), an EPC (every 10 years), deposit protection (within 30 days), Right to Rent checks (before each tenancy), and working smoke and carbon monoxide alarms.
The checklist at a glance
| What | How often | Give tenant a copy? |
|---|---|---|
| Gas Safety Certificate (CP12) | Every 12 months | Yes, within 28 days of the check, and to new tenants before they move in |
| Electrical Installation Condition Report (EICR) | Every 5 years | Yes, within 28 days, and to new tenants before they move in |
| Energy Performance Certificate (EPC) | Every 10 years | Yes, at the start of the tenancy |
| Deposit protection | Within 30 days | Yes, the "prescribed information" |
| Right to Rent check | Before each tenancy | No, but keep copies |
| Smoke & CO alarms | Start of each tenancy | No |
| Legionella risk assessment | Review regularly | No |
1. Gas Safety Certificate
Every 12 months
If your property has any gas appliances, such as a boiler, cooker or gas fire, a Gas Safe registered engineer must check them every year. They give you a Gas Safety Record, often called a CP12.
- Give existing tenants a copy within 28 days of the check.
- Give new tenants a copy before they move in.
- Keep records for at least 2 years.
Tip: you can have the check done up to 2 months early and keep the original expiry date, so there's no penalty for booking ahead.
2. Electrical safety check (EICR)
Every 5 years
A qualified electrician must inspect and test the electrical installation at least every 5 years, or sooner if the report says so. You'll get an Electrical Installation Condition Report (EICR).
- Give tenants a copy within 28 days of the inspection.
- If the council asks for it, you must provide it within 7 days.
- If the report says work is needed, it usually has to be done within 28 days.
If you miss it: councils can issue fines of up to £30,000.
More detail: EICR rules for landlords: how often, cost and fines.
3. Energy Performance Certificate (EPC)
Every 10 years
You need a valid EPC to let a property, and it lasts 10 years. Rented homes must usually have a rating of E or above, unless a valid exemption is registered. The government has proposed raising this minimum in future, so it's worth keeping an eye on.
You can check any property's current EPC for free on the government EPC register.
4. Deposit protection
Within 30 days
If you take a deposit for an assured shorthold tenancy, you must:
- Protect it in a government-approved scheme within 30 days of receiving it.
- Give the tenant the "prescribed information" about the scheme within the same 30 days.
If you miss it: a court can order you to pay the tenant 1 to 3 times the deposit, and it can affect your ability to regain possession.
5. Right to Rent checks
Before each tenancy
In England, you must check that every adult who will live in the property has the right to rent in the UK before the tenancy starts. Keep copies of the documents you checked. If someone has time-limited permission, you'll need to check again later.
The government's Right to Rent guidance explains which documents to accept.
6. Smoke and carbon monoxide alarms
Start of each tenancy
- A smoke alarm on every storey used as living accommodation.
- A carbon monoxide alarm in any room with a fixed combustion appliance, such as a gas boiler or wood burner (gas cookers are excluded).
- Check they work on the first day of each new tenancy.
- Repair or replace them promptly if a tenant reports a fault.
7. Legionella risk assessment
Review regularly
Landlords must assess the risk of legionella (bacteria that can grow in water systems). For most small homes this is a simple check you can do yourself. There's no fixed renewal date, but review it when anything changes, such as a new tenancy or new water system.
Other things to check
- Licensing: some councils require a licence for all rented homes in certain areas, and HMOs (shared houses) often need one. Check with your local council.
- Tenant information: make sure you give tenants the documents the government currently requires at the start of a tenancy. Check gov.uk for the latest list.
What about the Renters' Rights Act?
The Renters' Rights Act is bringing in big changes for landlords in England in stages, including ending "no-fault" section 21 evictions, moving tenancies onto a periodic basis, and introducing a new landlord database and ombudsman. The certificates above still apply, and staying compliant matters even more under the new rules.
Dates and details can change, so always check gov.uk for the current position.
How to never miss a deadline
The simplest system is:
- Write down every certificate's expiry date for each property.
- Set a reminder 2 months before each one, so there's time to book an engineer or electrician.
- Keep a copy of every certificate in one place, so you can send it to a tenant or the council quickly.
Want this done for you?
Remindlord will email you before every certificate is due, with all your documents in one place. Join the waitlist and get 50% off for life.
Join the waitlistThis guide is general information for landlords in England and isn't legal advice. Rules are different in Scotland, Wales and Northern Ireland, and can change. Always check gov.uk or a qualified professional for your situation.